NEWS

Total 254

[수상] 간삼건축, BIM·AI 기반 설계 업무 혁신… BIM AWARDS 2026 비전상 수상
AWARD
[Award] Gansam Advances BIM- and AI-Based Design Innovation… Wins Vision Prize at BIM AWARDS 2026new
▴ 105 projects delivered with BIM since its adoption in 2006… recognized for company-wide use and expansion ▴ Expanding design data assetization and AI use… in-house AI Integrated Platform officially launched in September Hyuk Lee, Principal of the Innovation Division at Gansam (right), receives the Vision Prize at the BIM AWARDS 2026 ceremony held on November 24 at the Korea Specialty Contractors Association building in Dongjak-gu, Seoul. ⓒGansam Gansam has won the Vision Prize at BIM AWARDS 2026 in recognition of building a BIM-based design system and applying and expanding it in practice across the company. Organized by buildingSMART Korea since 2009, the BIM AWARDS identify and honor outstanding cases that have contributed to the use and spread of Building Information Modeling (BIM). The Vision Prize is given to an organization or individual that has helped advance the technology through BIM-related policy, institutions, education, and other efforts. Gansam is a pioneer in adopting BIM in Korea's architectural design industry. Since adopting BIM in 2006, the company has delivered a total of 105 projects with BIM, including the Incheon International Airport Terminal 2 expansion as well as data centers, research facilities, and office buildings. In 2021, it set a five-year goal for company-wide BIM adoption and established a company-wide BIM-based design system by building design manuals and standard templates, switching its primary design tools, providing in-house training, and developing BIM leaders. From Company-wide BIM to Design Workflow Innovation In the course of rolling out BIM across the company, Gansam found that digitizing individual tasks alone has limits in raising productivity across the entire design process. To reduce information gaps and repetitive work between design stages, the company is now pursuing design data assetization linked with AI technologies. Using BIM as the Single Source of Truth for design information, it carries design data continuously from early planning through detailed design. This year, Gansam launched Team31, a dedicated team that combines its existing BIM team with experienced architectural designers. Working with design teams from the schematic design stage, Team31 develops architectural and structural information and identifies early the scope of drawings and the workload needed through detailed design. The aim is to raise the completeness of early-stage design and reduce uncertainty in subsequent design work. From Design Outputs to Experience and Judgment… Turning Design Data into Assets To cut down on BIM modeling work that repeats on every project, Gansam is also improving how it reuses existing design data. Led by Team31, the company built a Content Catalog and updated 1,500 standard families. It has turned into assets not only individual building elements but also space-level models that combine multiple elements, such as vestibules, stair cores, and hotel guest rooms, so that designers can choose and use models that fit the conditions of each project. Beyond design outputs, Gansam also turns the experience and judgment gained in the design process into assets. Existing drawings alone make it hard to understand why a particular design approach was chosen or what to watch for when applying it. Gansam's in-house Detail DB records application conditions, problem-solving processes, and practical precautions together with the drawings. By letting designers use existing details and leave evaluations and suggestions for improvement, the company ensures that accumulated design knowledge is used in later projects and keeps developing. Hyuk Lee, Principal of the Innovation Division at Gansam, explains the direction for improving design workflows by using BIM as the Single Source of Truth at buildSMART CONFERENCE 2026. ⓒGansam Expanding AI in Practice… Building a New Design Work Environment Gansam uses AI technologies in connection with its existing design tools to automate repetitive tasks and support the review of design alternatives. It automatically collects information needed for early design, such as site boundaries and surrounding buildings, and is working to automate modeling by connecting the 3D modeling tool Rhino with generative AI. It is also researching ways to review a range of design alternatives, such as generating AI design images from mass models that show a building's scale and form. In September, Gansam rolled out an AI Integrated Platform developed by its in-house AX (AI transformation) organization across the company. By connecting internal data with large language models (LLMs), the platform lets staff search, analyze, and apply design knowledge and project materials in their work. For data security, the platform runs independently on the internal network. Gansam plans to reduce repetitive work so that architects can focus on creative design and technological innovation, and to foster a work environment where active exchange among members creates new knowledge and technology. "For technological innovation to lead to real innovation in production, not only the tools but also the way an organization works must change," said Hyuk Lee, Principal of the Innovation Division at Gansam. "We are creating an environment where AI and digital technologies handle repetitive information searches and standardized tasks, while architects explore better design alternatives through creative inquiry and professional judgment." He added, "It is also important to build a culture of Value Exchange, in which we respect each member's expertise and grow together by sharing our experience and knowledge," noting, "We will continue to innovate both technology and the way we work to raise the productivity and quality of design together."
2026.11.25
[기사] 간삼건축, 미국 '7x24 Exchange' 참석…AI 데이터센터 동향 점검
GANSAM NEWS
[News] Gansam Attends '7x24 Exchange' in the U.S., Reviewing AI Data Center Trends
▴ Expanding AI infrastructure highlights the importance of power grid stability, cooling technology and community acceptance ▴ Engaging with the overseas industry based on data center design experience and PMDC standard model development Steve Brown, a former Google DeepMind executive, delivers a keynote on 'The Future of AI Agents' at the 7x24 Exchange 2026 Fall Conference in San Antonio, Texas, on October 26 (local time). ⓒ7x24 Exchange Gansam announced that it attended the 7x24 Exchange 2026 Fall Conference, held from October 25 to 28 in San Antonio, Texas, to examine technology trends in the AI data center industry and changes in the global market. Muchan Park, President of Gansam; Myoungryul Lee, Principal of the Insight Division; Kevin Kim, Principal of Gansam USA; and other senior executives and staff from the firm's U.S. subsidiary attended the conference. Gansam reviewed changes in the AI infrastructure market and the direction of data center design and construction methods, and explored opportunities for collaboration with the global industry. 7x24 Exchange is an international not-for-profit organization dedicated to the reliability of critical infrastructure that must operate 24 hours a day without interruption, including data centers, IT and networks. Launched in 1989, it holds conferences every spring and fall. This year's fall conference was held under the theme 'The Intersection of AI & Traditional Data Centers.' As the number of AI data centers grows, the conference focused on how securing power, cooling infrastructure and operational reliability are becoming prerequisites for moving projects forward. With rising AI computing demand increasing data center power consumption and load fluctuations, stable power supply and grid interconnection were discussed as key challenges. These changes are also affecting data center site selection and architectural design. Power availability is emerging as a major variable in determining project scale and location, while the spread of liquid cooling technology for high-density servers calls for changes in architectural planning, including floor-to-floor height, floor loads and equipment space. Participants also discussed ways to secure reliability that consider not only the redundancy of equipment inside the building but also interaction with the external power grid. Modularization and standardization to improve the speed and quality of data center construction were also key topics. As methods in which power and cooling equipment are prefabricated in factories and assembled on site become more widespread, the conference emphasized the importance of an approach in which architecture, building systems and construction disciplines collaborate from the early design stage and review manufacturing and assembly conditions. Alongside technical challenges, community acceptance of data center development was also a major agenda item. In the United States, local opposition to data center development has in some cases led to development restrictions and project delays. Noting that excluding residents from decision-making or failing to provide them with sufficient information can be a source of conflict, the discussion highlighted the importance of communicating with local communities and building trust before the permitting stage. Myoungryul Lee, Principal of Gansam's Insight Division, said, “As securing power becomes the key condition that determines whether AI data center projects can move forward, the scope of architectural design is expanding beyond individual buildings to campus-level planning that includes power generation, storage and substation facilities,” adding, “In response to these changes, Gansam plans to advance its capabilities to comprehensively review power and cooling infrastructure and operating conditions from the early design stage, and to continue researching and applying new design methods such as standardization and modularization.” Gansam has experience in more than 80 data center design projects, including Samsung Electronics DS HPC Center, LG Uplus Pyeongchon Mega Center and Gasan I-WILL Data Center. Drawing on expertise accumulated through projects across sectors such as finance, telecommunications, cloud and HPC, the firm is responding to the changing requirements of AI data centers. Gasan I-WILL Data Center, designed by Gansam (completed in 2025). It is Korea's first commercial data center to commercialize liquid cooling. ⓒGansam More recently, Gansam has also been participating in the development of standardization and modularization technologies to improve the construction speed and scalability of AI data centers. In September, the firm signed a memorandum of understanding with LG Uplus, GS E&C, Xi C&A and D&O CM to establish the PMDC Alliance, and began developing a standard design model for a 100MW hyperscale data center. Gansam plans to advance its design technologies in response to the changing demands of AI data centers, continue developing related technologies such as standardization and modularization, and expand exchanges and opportunities for collaboration with the global industry.
2026.11.18
[모집] ARiC(Archi Rise Camp) 2기 교육생 모집 안내
GANSAM NEWS
[Recruitment] ARiC (Archi Rise Camp) 2nd Cohort — Call for Trainees
ARiC 2nd recruit Archi RiseCamp   2026 K-New Deal Academy Gansam  ×  Junglim  ×  Heerim Three of Korea's leading architecture firms, together ARiC : Archi Rise Camp — 2nd Cohort Recruitment Application Period Oct 19 – Nov 8 Capacity Cheonan 55 · Yangjae 50 Tuition Fully Free Apply Now → Eligibility Unemployed youth interested in—or exploring a career in—architecture, spatial, or digital design,aged 15 to 34 *Excludes employment-insured workers **For those who have completed mandatory military service, the upper age limit is extended by the length of service (up to age 39) Program Overview Course Name [Gansam × Junglim × Heerim] ARiC (Archi Rise Camp) 2nd Training Period Nov 30, 2026 – Mar 29, 2027 Application Period Oct 19 – Nov 8, 2026 Interview Period Nov 10 – Nov 13, 2026 Results Announcement Nov 13, 2026 Capacity Cheonan Campus 55 trainees / Yangjae Campus 50 trainees (you may apply to both) Curriculum Professional Architecture Process Practice  Hospitality, Healthcare, Smart Office Digital Transformation — Fundamentals  3D Modeling, D5 Render Digital Transformation — Advanced  AI, 3D Printing Integrated Architecture Project (PBL) Mentoring by Industry Professionals Beyond-the-Job Training  Strengths & Leadership, Spatial Branding & Data Structuring, Modular & Lighting, Architecture Firm Tours, Site Visits, Electives, Orientation, Completion Ceremony Training Hours 09:00 – 18:00 Excludes Saturdays, Sundays, and public holidays* Some project sessions may run past 18:00 Venue · Cheonan Campus KCCI Cheonan Technology Training Center 345 Bongjeong-ro, Seobuk-gu, Cheonan-si, Chungcheongnam-do View on Naver Map → Venue · Yangjae Campus SLI Education Group Building 31 Gangnam-daero 30-gil, Seocho-gu, Seoul View on Naver Map → Benefits Tuition fully free No self-payment, unlike KDT programs Training allowance Cheonan Campus up to KRW 500,000/month · Yangjae Campus up to KRW 300,000/monthPayable when attendance and other requirements are met Frequently Asked Questions (FAQ) What kind of program is ARiC?+ ARiC (Architect Rise Camp) is an architecture-industry-focused youth talent development program jointly operated by Gansam, Junglim, and Heerim.Through architectural design practice, digital architecture technology, and project-based learning (PBL), it cultivates future architects with practical, job-ready skills. Do Gansam, Junglim, and Heerim run ARiC together?+ ARiC is an education program jointly planned and operated by Junglim, Gansam, and Heerim to develop future talent for the architecture industry.Each of the three firms has its own areas of expertise and project experience, and they have joined forces to give young people broader hands-on experience and more opportunities to grow.At ARiC, you can meet the experience of three of Korea's leading architecture firms in a single program. Gansam Junglim Heerim Key Sector Hotels & Mixed-Use Healthcare Facilities Smart Office Specialized Training Spatial Branding & Data Structuring Strengths & Leadership Modular & Lighting How much is the tuition?+ Tuition is completely free. Unlike KDT programs, there is no separate self-payment. Is there an allowance during the program?+ Trainees who meet attendance and other payment requirements may receive a training allowance of up to KRW 500,000 per month at the Cheonan Campus and up to KRW 300,000 per month at the Yangjae Campus.Eligibility and detailed criteria may vary by individual circumstances, so please refer to the separate guidance provided after final selection. What is the difference between the Cheonan and Yangjae campuses?+ Both campuses run the same program and curriculum. Choose based on where you live and your learning environment.However, the Cheonan Dujeong Campus offers a higher training allowance to support young people outside the Seoul metropolitan area.What matters more than the content is how actively you take part and grow over the 16 weeks.Choose the campus where you can participate most consistently. Recommended: Cheonan Campus Recommended: Yangjae Campus 10-minute walk from Dujeong Station (Line 1)10 minutes by subway from Cheonan-Asan Station (KTX, ITX)10 minutes by bus from Cheonan Express Bus Terminal 10-minute walk from Yangjae Station (Line 3, Shinbundang Line)5-minute walk from the Seocho Culture & Arts Center bus stop - Residents of the Chungcheong region and other areas outside the Seoul metropolitan area- Those who want a higher training allowance- Training allowance up to KRW 500,000/month - Residents of Seoul, Gyeonggi, and the rest of the metropolitan area- Those who value an easy commute- Training allowance up to KRW 300,000/month Do I need a Tomorrow Learning Card (Naeil Baeum Card)?+ No.ARiC is a K-New Deal Academy program, so you can apply regardless of whether you hold a Tomorrow Learning Card. Can I apply even if I've taken a K-Digital Training course before?+ Yes.You may apply to ARiC even if you have previously taken a K-Digital Training (KDT) course. Anyone who meets the other eligibility requirements can apply. Can I apply if I didn't major in architecture?+ ARiC welcomes unemployed youth aged 15–34 who are interested in architecture, spatial, or digital design, regardless of major.The program runs step by step from fundamentals to practice, so even those new to architecture can take part. I'm currently a university student. Can I apply?+ It depends.ARiC is an intensive program held on weekdays from 09:00 to 18:00, so it is difficult to take part if you are currently attending university classes.However, you may apply if your studies do not interfere with participation in the training. What is the selection process?+ [Recruitment Process] Application Interview Results Announcement Training Begins By 11:59, Nov 8 (Sun) Nov 10 (Tue) – Nov 13 (Fri) Nov 13 (Fri) Nov 30 (Mon) After applications close, a document review is conducted, and an online (non-face-to-face) interview may follow if needed.Final successful applicants will be announced on November 13, 2026, and the detailed schedule may change depending on recruitment circumstances. How to Apply Complete the Naver form  ·  Application period: Oct 19 – Nov 8, 2026 Apply Now → Contact  |  gayoung.lee@junglim.com Gansam  ×  Junglim  ×  Heerim  |  2026 K-New Deal Academy ARiC
2026.10.19
[기사] 간삼건축 설계 ‘고려대학교 구로병원 새암병원’ 첫 삽… 2029년 말 완공 목표
GANSAM NEWS
[News] Saeam Hospital at Korea University Guro Hospital, Designed by Gansam, Breaks Ground — Completion Targeted for the End of 2029
▴ Expanding key medical facilities, including breast and thyroid cancer centers, to strengthen cancer care ▴ Connected to the existing Building B to strengthen links between testing, treatment and therapy facilities ▴ Universal Outpatient Design applied with both patients and medical staff in mind Key guests pose for a commemorative photo at the groundbreaking ceremony for Saeam Hospital at Korea University Guro Hospital. ⓒGansam The groundbreaking ceremony for Saeam Hospital at Korea University Guro Hospital, designed by Gansam, was held on September 22. The hospital will rise on the site of Parking Lot No. 1 at Korea University Guro Hospital in Guro-gu, Seoul, with nine basement levels and six floors above ground and a gross floor area of 30,458㎡, and is targeted for completion by the end of 2029. Saeam Hospital is Phase 2 of the hospital master plan that Korea University Guro Hospital has pursued since 2019. Phase 1, Future Hall, was completed in 2022. Following Future Hall, Gansam took on the design of Saeam Hospital. Overall view of Korea University Guro Hospital. Saeam Hospital will be built on the site of the existing Parking Lot No. 1 and was planned so that it can operate in an integrated manner with the existing hospital. ⓒGansam A defining feature of the project is that the cancer center currently located in the existing Building B will be relocated to and expanded in Saeam Hospital, and the two buildings will be connected so that testing, treatment and therapy for cancer patients flow closely together. To this end, alongside the new Saeam Hospital, remodeling designs for the existing Building A and Building B were also carried out. Saeam Hospital will house key medical facilities linked to cancer care, including a Breast Cancer Center, a Thyroid Cancer Center, a colonoscopy room and a chemotherapy infusion room. The cancer hospital outpatient area on the second floor applies Universal Outpatient Design, in which multiple clinical departments share consultation and examination rooms. Space can be used flexibly according to treatment demand, making it convenient for both patients and medical staff. The chemotherapy infusion room and the Breast and Thyroid Cancer Center are located on the third floor. The chemotherapy infusion room increases its number of beds while maintaining its functional link with the chemotherapy compounding room in Building B. The Breast and Thyroid Cancer Center was designed with expanded consultation and examination rooms to improve its functions over the existing facility. Perspective of Saeam Hospital at Korea University Guro Hospital. The connection with the existing Building B was also planned as part of a single building and designed with a hidden curtain wall to secure a sense of openness. ⓒGansam The exterior takes harmony with the existing hospital into account. By carrying the vertical design elements of Future Hall into the horizontal façade composition of Building A and Building B, hospital buildings built in different periods are visually connected. The projecting horizontal bands and ribbon windows reflect the design of Building A and Building B. Between the horizontal bands are vertical louvers that carry on the vertical design of Future Hall. The arc-shaped louvers control the sunlight entering the interior, while the shadows that change with the direction of the sun add depth to the exterior. “Cancer patients undergo multiple tests and treatments after diagnosis, so continuity in moving between medical facilities and in the course of care is important,” said Taesang Lee, Director of Healthcare Design at Gansam, who led the design. “For Saeam Hospital, we planned patient circulation around the connection with the existing hospital and organized the spaces so that medical staff can provide care efficiently.” Meanwhile, Gansam operates its Healthcare Design division, an organization specializing in healthcare facilities. It has designed numerous healthcare facilities, including the Yonsei Cancer Hospital Heavy Ion Therapy Center, Chung-Ang University Gwangmyeong Hospital, The Catholic University of Korea, Eunpyeong St. Mary’s Hospital and Konyang University New Hospital. Saeam Hospital, Korea University Guro Hospital · Use: Medical Facility (General Hospital) · Location: 148 Gurodong-ro, Guro-gu, Seoul · Building Area: 2,118㎡ · Gross Floor Area: 30,458㎡ · Floors: B9, 6F · Scheduled Completion: End of 2029 · Design: Gansam · Design team   Taesang Lee, Kibeom Park, Kangyoon Lee, Minjung Um, Soohyun Kim, Yeonju Kim,   Euiryeong Jeong, Hongyeol Kim, Hyeryoun Kim, Boseung Kim
2026.10.15
[기사] 간삼건축 설계 ‘연세대학교 원주연세의료원 제2병원’ 착공… 본원과 연계한 지역 의료거점 조성
GANSAM NEWS
[News] Second Hospital of Wonju Yonsei University Health System, Designed by Gansam, Breaks Ground — Creating a Regional Healthcare Hub Linked with the Main Hospital
▴ A 50-bed hospital with one basement level and seven floors above ground in Wonju Enterprise City — scheduled for completion in March 2028 ▴ The main hospital handles severe and emergency care, while the second hospital takes on outpatient care, health screenings and everyday essential care ▴ Circulation designed from on-site interviews and healing gardens — improved accessibility through links to public transit Key guests prepare for the ceremonial groundbreaking at the groundbreaking ceremony for the second hospital of Wonju Yonsei University Health System. ⓒGansam The second hospital of Wonju Yonsei University Health System, designed by Gansam, held its groundbreaking ceremony on September 14 at the project site in Gagok-ri, Jijeong-myeon, Wonju-si, Gangwon State, beginning full-scale construction. The second hospital will have a site area of 17,983㎡ and a gross floor area of 11,964㎡, with one basement level, seven floors above ground and 50 beds. It is scheduled for completion in March 2028 and, after about three months of trial operation, is expected to begin full operation in June of the same year. Perspective of the second hospital of Wonju Yonsei University Health System. A vertical pattern expressing the hospital’s identity is applied to the façade, and the building is positioned so that it can be easily recognized from the intersection. ⓒGansam From Prevention to Specialized Care within the Region — Accessibility Secured through Public Transit Links Through the second hospital, Wonju Yonsei University Health System plans to build a ‘regionally self-sufficient healthcare system’ in which care continues within the region, from prevention and health management to specialized treatment. The second hospital will take on outpatient care, health screenings and everyday essential care, while the main hospital, a tertiary hospital, will concentrate its capacity on treating severe and emergency patients in the province. The second hospital will be located close to the daily lives of residents of the Enterprise City and the Jijeong-myeon and Munmak-eup areas, where access to medical facilities has been relatively limited. During the permit consultation process, Gansam incorporated a bus stop and a taxi stand so that patients without a car can also reach the hospital by public transit. Interviews with 16 Departments over Two Months — Refining the Design by Coordinating On-site Needs During planning, Gansam spent two months interviewing staff from 16 departments — including the health screening and endoscopy centers, purchasing and logistics, surgery, central supply, radiology, nutrition, patient administration, general affairs and the inpatient wards — reviewing the movement paths of patients and medical staff, the connections between departments and the flow of logistics. As a result, the hospital was divided vertically by function. Outpatient care and health screening are placed on floors 2 to 4, and surgery and inpatient functions on floors 5 and 6, minimizing the crossing of paths between outpatient visitors and inpatients. The hospital building and the annex were planned as structures that can be expanded to respond to future changes in medical demand. Registration and Tests on a Single Floor, an Outpatient Area Seen at a Glance — A Layout Centered on User Experience On the first floor, the lobby is brought together with patient administration, laboratory and pharmacy functions so that registration, payment and blood tests can all be completed on a single floor. The outpatient area on the second floor is organized around a central atrium spanning two floors, so that visitors can see at a glance where they need to go as soon as they enter, and the waiting areas are generous enough not to feel cramped even when patients sit with a caregiver. The radiology department on the third floor connects directly to the outpatient floor, and its circulation was planned around the flow from imaging tests to endoscopy. The health screening center on the fourth floor secures the area and facilities for a demand of about 120 screenings per day and applies dedicated screening circulation. The main waiting areas are placed by the windows to bring in natural light, and the gynecology area is separated from the other screening spaces to strengthen privacy. An Indoor Courtyard beside the Wards, a Rooftop Garden for Medical Staff — Landscape as Part of Recovery The fifth floor will house the surgical department, the sixth floor the inpatient wards and an indoor courtyard, and the seventh floor the staff cafeteria and a rooftop garden. The indoor courtyard is placed on the same floor as the wards so that inpatients can experience nature without leaving the ward. The rooftop garden is linked to the staff cafeteria and planned as a place of rest for medical staff. This reflects research showing that the hospital environment affects patients’ recovery and the workload of medical staff. In 1984, American environmental psychology researcher Roger Ulrich published findings that patients recovering from surgery in rooms with a window view of trees had shorter hospital stays and used fewer painkillers than patients whose rooms faced a wall. Since then, in the field of evidence-based design (EBD), physical environments that reduce the stress of medical staff have also been treated as a factor directly linked to the quality of care. A Garden Open 24 Hours and a First-Floor Café — A Place for Everyday Life, Not a Hospital Visited Only When Sick The second hospital also puts effort into lowering the threshold of the hospital for local residents. A garden open to anyone 24 hours a day is being created, and a café and lounge on the first floor allow people to stay whether or not they are receiving treatment. The intent is to use the hospital not merely as a medical facility but as a public space that local residents visit in their daily lives. Gansam expects these everyday points of contact to help improve access to healthcare. “Before it is a building, a hospital is a small city where many people gather and come and go,” said Taesang Lee, Director of Healthcare Design at Gansam. “From the very beginning, we considered how patients, caregivers and medical staff would experience the space, and what kind of relationship the hospital would form with the region.” He added, “A hospital is a growing building that begins to change the moment it is completed. We will faithfully bring Gansam’s experience and expertise in healthcare design to this project so that the second hospital is completed as a healthcare hub trusted by local residents and a hospital that grows together with the region.” Meanwhile, Gansam has continued to design healthcare facilities centered on the patient experience. At the Yonsei Cancer Hospital Heavy Ion Therapy Center, Korea’s first heavy ion cancer treatment facility, it created a sunken court in the underground treatment area so that patients can encounter light and nature. Gansam has also designed numerous healthcare facilities ranging from general hospitals to specialty hospitals, including Chung-Ang University Gwangmyeong Hospital, Konyang University New Hospital and The Catholic University of Korea, Eunpyeong St. Mary’s Hospital. Second Hospital of Wonju Yonsei University Health System · Use: Medical Facility (Hospital), Neighborhood Living Facility · Location: 1284-2 Gagok-ri, Jijeong-myeon, Wonju-si, Gangwon State · Site Area: 17,983㎡ · Gross Floor Area: 11,964㎡ · Floors: B1, 7F (50 beds) · Scheduled Completion: March 2028 · Design: Gansam   · Competition team   Taesang Lee, Cheonhaeng Kim, Bokyeong Kim, Soohyun Kim,   Sohee Kim, Jaeyun Lee, Myoungryul Lee, Taehyouk Kim,   Mira Kim, Jongwoon Oh, Minseok Kil, Yunsang Shin   · Design team   Bokyeong Kim, Donghoon Lee, Yeonju Kim, Jaeyun Lee, Cheonhaeng Kim, Minhyuk Jun
2026.10.07
[기사] 간삼건축 설계, 쉐라톤 제주 오픈…객실의 오션뷰를 호텔 전체 경험으로 확장
GANSAM NEWS
[News] Sheraton Jeju Opens with Design by Gansam — Extending the Oceanfront from Guest Rooms to the Entire Hotel Experience
▴ Following the 1994 original design, Gansam also led the remodeling — carrying forward and reinterpreting the spatial value of the existing architecture ▴ The oceanfront experience extends to the lobby, lounge, dining and a 100m infinity pool The main entrance of Sheraton Jeju. Following the original design in 1994, Gansam returned more than three decades later to design the remodeling. ⓒGansam Sheraton Jeju, remodeled to a design by Gansam, held its grand opening on September 14. Sheraton Jeju is a project in which Gansam remodeled, more than three decades on, a hotel it had originally designed in 1994. It carries forward the spatial value and sense of place of the existing building, while reconfiguring the spatial structure and the experience of stay for changed travel patterns and hospitality environments. The remodeling began from what had changed over those three decades — the environment around the hotel and the way it is used. The large atrium of Sheraton Jeju before the remodeling. It was the heart of the existing hotel, creating an environment of stay like a vertical city within. ⓒGansam At the time of the original design in 1994, the northern coast of Jeju was strongly affected by high winds and irregular weather. Gansam placed a large atrium inside a building some 200 meters long and organized the guest rooms and various programs around it. It was an ‘Atrium Hotel,’ planned so that activities could continue through all four seasons while reducing the influence of the outdoor environment. The environment around the hotel then changed. Along the Tapdong coast, which once had to contend with strong winds, waves and repeated overtopping, a breakwater about 1.1 kilometers long was built in 2020 to reduce overtopping damage. The way travelers come to Jeju has changed as well. Where group tours and MICE demand were once the main market, tourism on Jeju is now being reorganized around independent travel. According to the Jeju Tourism Organization’s 2025 survey of visitors to Jeju (‘2025년 제주 방문관광객 실태조사’), 96.8 percent of domestic visitors and 91.9 percent of international visitors came as independent travelers. In response to these changes, Gansam retained the spatial value of the existing atrium while extending the spatial experience — which had faced inward — toward the sea of Jeju. The 100-meter infinity pool newly created along the Jeju sea. The oceanfront experience, once concentrated in the guest rooms, now extends across the hotel’s shared spaces and the whole course of a stay. ⓒGansam The orientation of the spaces was turned so that the Jeju sea, previously viewed mainly from the guest rooms, can also be experienced in the main shared spaces including the lobby, lounge and dining areas, and a 100-meter infinity pool was newly created along the water. The value of the oceanfront, once concentrated in the guest rooms, now extends across the whole course of a stay — arriving at the hotel, staying, dining and resting. As a result, Sheraton Jeju has changed from an ‘Atrium Hotel,’ which created a city-like environment of stay inside the building, into an ‘Oceanfront Hotel’ that draws the Jeju sea into the center of the hotel experience. “I believe good remodeling is not about erasing the existing architecture, but about selecting the values that remain valid over time and connecting them to the next era,” said Hyosang Lee, architect at Gansam. “We inherited the existing atrium-centered structure, while newly connecting the shared spaces and the circulation of stay so that the Jeju sea can be experienced naturally throughout the hotel.” Gansam has continued to take on remodeling projects that reinterpret the value and potential of existing architecture. It recently served as the local design partner for Centre Pompidou Hanwha, which reconfigured an annex of the 63 Building into a multi-purpose cultural complex, and has carried out a range of remodeling projects across hotels, offices and cultural facilities, including Mondrian Seoul Itaewon, The Plaza Hotel and Hanwha Jangyodong Office.
2026.09.22
[영상] Space Film|물결과 수평선이 머무는 곳, 쉐라톤 제주
YOUTUBE
[Video] Space Film | Where Waves Meet the Horizon, SHERATON Jeju
Sheraton Jeju Hotel has officially reopened following an extensive renovation. The newly transformed spaces unfold through a sequence of sea and city views,  creating a stay that brings guests closer to the essence of Jeju. From the sweeping horizon framed by the lobby to the 100-meter infinity pool stretching toward the sea,  discover a renewed experience of Jeju and its coastline.     Watch this video on Gansam’s YouTube channel
2026.09.17
[기사] 간삼건축, 모듈러 AI 데이터센터 표준 설계모델 개발…PMDC 얼라이언스 참여
GANSAM NEWS
[News] Gansam to Develop Standard Design Model for Prefabricated Modular AI Data Centers, Joining PMDC Alliance
▴ Developing a hyperscale PMDC with LG Uplus, GS E&C, Xi C&A and D&O CM ▴ New-build and retrofit models developed in parallel — shorter construction periods, consistent quality and scalability Executives of Xi C&A, GS E&C, LG Uplus, D&O CM and Gansam at the signing ceremony for the PMDC Alliance. ⓒLG Uplus Gansam is developing a standard design model for the Pre-fabricated Modular Data Center (PMDC), a method aimed at improving the construction speed and scalability of AI data centers (AIDC). On September 4, Gansam signed a memorandum of understanding for the establishment of the PMDC Alliance with LG Uplus, GS E&C, Xi C&A and D&O CM at LG Uplus Pyeongchon Mega Center in Anyang, Gyeonggi Province. The signing ceremony was attended by the chief executives of the five participating companies. The agreement was pursued to establish a PMDC standard model that shortens the construction period of AI data centers while securing consistent quality and future scalability. As AI semiconductor and server technologies advance, the power density and equipment requirements of data centers are changing rapidly. This has increased the importance of standardized and modular approaches that accelerate initial construction while responding flexibly to changes in technology and demand. PMDC is a construction method in which building structures and power and cooling systems are standardized, pre-fabricated at factories, and then assembled and installed on site. Compared with conventional on-site construction, it reduces the construction period and on-site risks, improves quality consistency, and makes it easier to expand facilities in stages as demand changes. Officials from the PMDC Alliance member companies tour LG Uplus Pyeongchon Mega Center. ⓒLG Uplus   The participating companies will develop a 100MW hyperscale PMDC, covering both a new-build model for greenfield sites and a retrofit model that converts existing buildings into AI data centers. Drawing on experience from more than 80 data center design projects, Gansam will develop PMDC standard design modules and design solutions optimized for AI data centers. At the site review stage, the firm will take charge of site-specific master planning and permitting, and will support the application of the PMDC model through design optimization. LG Uplus will define operational standards and technical requirements, set the business direction and verify the model. GS E&C will provide constructability reviews, process optimization and EPC capabilities for the new-build model, while Xi C&A will develop models utilizing existing buildings and optimize power and cooling. D&O CM will support overall construction management (CM). By combining their expertise in design, construction, operation and CM, the participating companies plan to establish a PMDC standard model that can be applied to a wide range of sites and business conditions. Muchan Park, President of Gansam, said, “For AI data centers, what matters is not only the speed of initial construction but also the flexibility to continuously expand and respond to changes in technology and demand,” adding, “We will develop the data center design experience Gansam has accumulated into a PMDC standard design model and help build an infrastructure foundation that can meet industry demand.”
2026.09.09
[기사] 호텔은 어떻게 여행의 ‘목적지’가 되는가… 간삼건축 이효상 건축가, 서울국제건축영화제서 호스피탈리티 변화 조명
GANSAM NEWS
[News] How a Hotel Becomes a ‘Destination’ — Gansam’s Hyosang Lee on Changing Hospitality at Seoul International Architecture Film Festival
▴ Forum explores the changing landscape of stay and hospitality under the theme ‘A space that has become the destination, not the backdrop of a journey’ ▴ Sheraton Jeju presented as a case of reinterpreting an ‘Atrium Hotel’ into an ‘Oceanfront Hotel’ Poster for Host Architect Forum 2026, the opening program of the 18th Seoul International Architecture Film Festival. ⓒKIRA Hyosang Lee, architect at Gansam, will join Host Architect Forum 2026 as a panelist on September 5, sharing insights on changing hospitality spaces and new experiences of stay. Hosted by KIRA as part of the 18th Seoul International Architecture Film Festival, the forum carries the theme ‘Stay — A space that has become the destination, not the backdrop of a journey.’ It examines how accommodation has moved beyond being a facility required along the way, to a point where the experience of staying itself becomes the purpose of travel — discussed from the perspectives of architecture, space planning and operations. Lee will present the repositioning of Sheraton Jeju under the title ‘The Evolution of Our Own Heritage : Sheraton Jeju (1994-2026).’ Sheraton Jeju, set to open this September, was remodeled by Gansam — the firm that designed the original building more than three decades ago. The remodeling carries forward the spatial value and sense of place of the existing architecture, while repositioning the hotel’s spatial experience and identity for changed travel patterns and hospitality environments. The atrium, a symbol of the vertical city within. It was the heart of Sheraton Jeju before the remodeling. ⓒGansam The original design began with its setting on the northern coast of Jeju and the island’s irregular maritime climate. A curved exterior evoking a moored passenger ship was wrapped with deck-like terraces, and an atrium of urban scale was placed inside a building some 200 meters long. It created an all-weather space independent of the weather, while the sea remained something to be viewed through guest room windows. The 100m infinity pool created through the remodeling. The value of the oceanfront, once concentrated in guest rooms, now extends across the entire stay. ⓒGansam The repositioning focused on reorganizing the relationships between the sea and the city, and between people and space. The atrium-centered ‘inward-oriented spatial structure’ was turned into an ‘outward-oriented spatial structure’ that extends the spatial experience toward the sea and nature of Jeju, and the value of the oceanfront — once concentrated in the guest rooms — was extended across the lobby, lounge, dining and pool. As a result, the building changed from an ‘Atrium Hotel,’ a vertical city within, into an ‘Oceanfront Hotel’ that faces outward and becomes the destination of a journey. “In the original design, the sea was an object to be viewed. Now what was needed was a shift toward a program in which coming and staying itself becomes the destination of the journey,” Lee said. “It is a work that reinterpreted space and program on a continuity of time rather than a break from it.” Lee has carried out design projects centered on hospitality and leisure. His major works include ▴MONDRIAN SEOUL ITAEWON ▴Gravity Seoul Pangyo ▴Local Stitch Creator Town Seogyo ▴Sheraton Jeju, and he received IDEA 2024 for the movable modular ‘Tiny Resort.’ Host Architect Forum 2026 takes place at 2 p.m. on September 5 at the Grand Auditorium of Ewha Womans University. Younggyu Shim, architecture PD at Project Day, moderates, with panelists Hyosang Lee of Gansam, Kyungrok Noh, co-principal of Z_Lab, and Seokhun Kim, creative director of Studio Eccentric. Further details are available on the official channels of the Seoul International Architecture Film Festival. Registration is available through Naver Smart Store. Related Coverage (in Korean) [대한경제] 간삼건축 이효상 건축가, 국제건축영화제서 ‘호텔의 진화’ 조명 [세계일보] 간삼건축 이효상 건축가, 서울국제건축영화제서 호텔 공간 변화 조명 [국토일보] 간삼건축 이효상 건축가, ‘호스트 아키텍트 포럼 2026’서 호스피탈리티 공간의 변화 제시 Host Architect Forum 2026 · Date: 2 p.m., September 5, 2026 · Venue: Grand Auditorium, Ewha Womans University · Host: KIRA (18th Seoul International Architecture Film Festival program) · Theme: Stay — A space that has become the destination, not the backdrop of a journey Official Forum PageRegister
2026.09.01
[영상] 간삼건축 신입사원 인터뷰 | 13명의 신입사원이 말하는 간삼에서의 6개월
YOUTUBE
[Video] Gansam New Employee Interview | The First Six Months
In a new environment, with unfamiliar work and systems encountered for the first time, new employees meet new questions every day. “Where do I begin?” “Who should I ask?” “Can I do this well without making mistakes?” Thirteen new employees at Gansam look back on their first six months and share the moments of growth they found in their own place. Seniors who explain the reasoning and background behind a decision, not just the answer. Colleagues who connect their experiences to build better answers together. And a process of understanding the work and the organization more broadly through training, mentoring and job rotation. The tension of an unfamiliar first day slowly turns into ease, and varied experience becomes the confidence for the next challenge. Hear what Gansam’s new employees have to say. Architecture that leads our lives and the landscape of the city in a better direction. If you would like to walk that path with us, begin at Gansam. Apply for 2027 Recruitment →Application period: Aug 14 – Aug 21, 2026, 6:00 PM (KST)
2026.08.14
  • 10
  • 254